Site Installation of the Contractor for the Construction of an Imagery Center

Vous êtes ici :

Site Installation of the Contractor, ABACUS TECHNICAL SERVICES, P.O Box 333 Limbe, took place on Friday, 14th November 2025 at the MAMFE District Hospital for the Construction of an Imagery Center worth about 349,043,162frs.

The site installation team paid a courtesy visit to the SDO Manyu. This team was received by the 1st Assistant SDO for Manyu.

After this courtesy call, the team left for the site at the MAMFE District Hospital.
The team was welcomed by the Director of the MAMFE District Hospital. Together with his management staff, the Director of the MAMFE District Hospital led us to the site for the installation of Abacus Technical Service to start work.
Mr. Pascal Kolo, explained the Grievance Management Mechanism to all, especially to the Focal points. Materials were handed over to these focal points.
Below are the installation pictures of Abacus Technical Service at the Mamfe District Hospital for the construction of an Imagery Center.
The Control Mission was present and took down the minutes of this Site Installation

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée Champs requis marqués avec *

Poster commentaire

Annonces

Inscrivez vous, pour avoir toutes les actualités et évènements avenirs

Visiteurs du site

Total des visiteurs :

2660